bewellplus.gsu.edu
chelle25 chelle25
  • 13-03-2017
  • Mathematics
Answered

I need help? Show ur work.

I need help? Show ur work. class=

Verified Answer :

RubyX RubyX
  • 13-03-2017

He finished the job at 1:15 P.M.

Answer Link
Anonymous Anonymous
  • 13-03-2017

8:45 AM + 4 1/2 hours = 
----------------------------------
8+4= 12
0:45 + 0:30 = 1:15
----------------------------
12:00 + 1:15 = 
1 : 15 PM

Answer Link

Related Questions

What are the lower bound estimate and the upper bound estimate found by rounding to the greatest place 937 156 A lower bound 700 upper bound 800 B lower bound 7
What is the value of n 3n 16 7n
Preimage ABCD was dilated to produce image ABCD What is the scale factor from the preimage to the image Enter your answer in the box as a fraction in simplest f
What two consecutive numbers have a product of 22952
When Mendel crossed two hybrid plants for stem height Tt what results did he always get
what is ultrafication
Describe a real world example of when it is necessary that line segments are parallel
Hey i need your help i attached it thank you so much it is compare and contrast
One step in the production of hydroelectric power involves A falling water that turns a turbine B hot water from under the ground C tides that pour through a ba
To recall is to A bring something back to mind B restate something in your own words C combine ideas or concepts into a whole D take the main points and shorten