Six workers can do 9 identical jobs in 3 days. How long will it take 4 workers to do 10 such jobs ???
A) 3 days
B) 4 days
C) 5 days
D) 6 days
E) more than 6 days

I guess it's ans is D.

Verified Answer :

basithsabdul basithsabdul
  • 20-08-2014

6 workers-9 jobs in 3 days
In one day 6 workers can do 3 jobs
In one day 1 worker can do 0.5 job
4 workers can so 2 jobs in a day
So. They can do 10 jobs in 5 days

Answer Link

Related Questions

find a positive number that equals 2 when added to its square
In the novel Frankenstein what does the creatures connection to nature suggest about him
eight more than four times a number is 12
Que beneficios y desventajas trajo la llegada de Cristóbal Colón en América
What leisure activities could lead to an increased income
if 26 312 420 530 642 then 9
suppose you are given seven collinear points Make a conjecture about the number of ways to connect different pairs of the points
Why does every sample of given substance has the same properties
To which of the following places did Cheng ho not travel
There are more hydroxide ions in a solution than hydrogen ions The solution is acidic basic neutral a salt