bewellplus.gsu.edu
jjhjfj
jjhjfj jjhjfj
  • 14-12-2015
  • Mathematics
Answered

A contractors crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Verified Answer :

nmatiska nmatiska
  • 14-12-2015

This equates to the division problem 54/3, which is equal to 18.
It would take them 18 weeks to frame all 54 houses.

Answer Link
Rainbowcloudycupcake
Rainbowcloudycupcake Rainbowcloudycupcake
  • 14-12-2015

18 weeks to frame 54 houses hope that helps

Answer Link

Related Questions

An atom has 13 protons and 14 neutrons What is its mass number
A major characteristic of poetry is the compression of images into the fewest number of words True or False
15 Explain why it is important to include a variety of food amp drink in the diet of an individual with dementia
Do you think that immigrants who lived in urban ghettos had a harder or an easier time adapting to American culture than immigrants in other locations
In which political system are multiple political parties most common totalitarian aristocratic parliamentary socialist
Precipitation clouds are observed at a distance of about 700 miles to the west of a city The clouds are seen moving eastwards at an average rate of 20 miles per
Who is least likely to be chosen as a mediator during a negotiation
How many times can 40 go into 235
how would i write 0489 in exlanded form
A cone has a volume of 150 cm cubed what is the volume of a cylinder that just holds the cone