bewellplus.gsu.edu
Bugsytherooster
Bugsytherooster Bugsytherooster
  • 26-05-2014
  • Mathematics
Answered

To make concrete it takes 8 parts crushed gravel, 7 parts water and 5 parts cement mix. A worker needs to make 220kg of concrete. How much crushed gravel, water and cement mix is needed?

Thanks!!! 

Verified Answer :

Ryan2
Ryan2 Ryan2
  • 26-05-2014
A8 + 7 + 5 = 20 parts
b) 220 kg ÷ 20 = 11
c)  8 parts crushed gravel: 8 x 11 = 88 kg
     7 parts water: 7 x 11 = 77 kg
     5 parts cement: 5 x 11 = 55 kg
Answer Link

Related Questions

How do you write 1125 as a decimal
PLEASE HELP What is true about African architecture All of the above There were no permanent structures built until the 1400s No pyramids are found outside of E
What type of punctuation is not used internally in a sentence
Exploring how the parts work together to create the whole is the a topic b theme c analysis d purpose
One canned juice is 15 orange juice another 10 orange juice How many liters of each should be mixed together in order to get 5l that is 11 orange juice
Given 3x 4 33 Prove x 15
What is one distinguishing characteristic of eukaryotic cells
The first step in writing an essay is
find the product 7300 7hundredshundreds
Given the triangle below which of the following is a correct statement A csc right triangle B right triangle equals fraction 3 over 2 B csc right triangle C rig