bewellplus.gsu.edu
CaroHer CaroHer
  • 26-05-2014
  • Mathematics
Answered

Joey can assemble all of his factory work in four hours. Phil takes six hours to assemble the same amount of factory work. If they worked together to assemble the same job together, how long would it take?

Verified Answer :

Hippalectryon
Hippalectryon Hippalectryon
  • 17-06-2015

Mean time : \(\frac{4+6}2=5\)

Since they're two, it would take \(\frac{5}2=\boxed{2.5\text{ hours}}\)

Answer Link

Related Questions

I need help simplifying 29538
Which was built first the Palace of Montezuma or the Presidents Palace
Which agreement was labeled by the Nazis as unfair to Germany 1 Treaty of Versailles 2 Soviet Nonaggression Pact 3 Munich Pact 4 Treaty of BrestLitovsk
Arjuns cafe uses 1 25 bag of coffee everyday for how many days would 4 15 bags of coffee last
how many amendments have been made to the constitution since its ratification
A line passes through the points p a and p a where p and a are real numbers If p0 what is the yintercept Explain your reasoning
What is the symbol for the carbon isotope with seven neutrons
Which of the following is not an example of a lipid A Oils B Fats C Ribose D Waxes
Who would benefit most by being able to convey a message in only six words a a doctor delivering a diagnosis b a camp counselor telling a ghost story c a politi
Multi Step Maya trains 5 days each week for a triathlon In 5 weeks she logs 246 holes in the pool 44545 miles on the bike and 167 45 miles running On average ho