bewellplus.gsu.edu
naomioprea14
naomioprea14 naomioprea14
  • 27-02-2017
  • Mathematics
Answered

A manager has 2500kg of sand delivered to a construction site every day.

about how many tons of sand does he have delivered to the site after 4 weeks.

A2.5 tons
B19.3 tons
C77.2 tons
D324,000 tons

Verified Answer :

captaincleanfreak
captaincleanfreak captaincleanfreak
  • 28-02-2017

C 77.2 tons for four weeks

Answer Link

Related Questions

14 cup fresh oregano equals how much dried
What is 4263 in the simplest ratio
Bob left work and traveled to school at an average speed of 25 mph If it took bob 35 minutes to reach school how far is Bobs school from his place of work
A tropical cyclone characterized by heavy rain lightning wind and thunder
Help please
How long is the line that joins the two points A13 and B22
Tim can remember what he had for lunch yesterday this is an example of aan a a episodic memory b b nondeclarative memory c c semantic memory d d implicit memory
Which statements best describe the atoms of the gas neon Check all that apply They move at high speeds They move freely in all directions They vibrate in place
How to solve this problem
How would you say the dvd player is to the right of the bed