bewellplus.gsu.edu
Anonymous Anonymous
  • 07-02-2017
  • Mathematics
Answered

An experienced carpenter could build a house in 4 days. How much would he have if he worked for 2 days?

Verified Answer :

kinseydaviscorr
kinseydaviscorr kinseydaviscorr
  • 07-02-2017

he would have half a house

Answer Link
Anonymous Anonymous
  • 07-02-2017

he would have built half of a house

Hope this helps!

Answer Link

Related Questions

What is the term for different jobs that different cells perform in a multicellular organism A functions B systems C levels D contractions
What concept of democracy is best illustrated by the following saying The right to swing my fists ends where the other mans nose bleeds
What are the features of a good medicine
A factor that is manipulated in an experiment is a dependent variable a True b False
A garden snail moves 16 foot in 13 hour This is unit rates Please explain your answer
The cost of 2 tv and 3 DVD player is 1421 The cost of 1 dvd is half of the tv Whats the cost of the tv
what significant events were occurring in england and north america at the time that the wealth of nations was written
is going to help me clean and cook all these fish AWhom BWhich Cwho D Whose
Identify the factors of x2 5x 24 x 8x 3 x 8x 3 x 4x 6 x 4x 6
Which is irrational A tex frac642 tex B 082 there is a line over 8 and 2 C texfrac23 tex D tex frac sqrt25 sqrt81 tex