Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Verified Answer :

madankapoor10
madankapoor10 madankapoor10
  • 23-03-2014

1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Related Questions

temperature rises 17 degrees
Which two hormones promote thickening of the endometrium A FSH and LH B Estrogen and FSH C LH and estrogen D Progesterone and estrogen
Lisa is putting a border made of ribbon around her rectangular sign the sign is 28 inches wide what are the possible lengths the sign can be if their is no more
Ron lost 10 points seven times playing a video game he then lost an additional 100 points for going over the time limit what was the total change in his score
Which two countries are the most populated in North America Canada and Greenland Greenland and Mexico Mexico and Canada the US and Mexico
inertia is the resistance of an object to a change
Explain whether smoke filling up a room is diffusion or not
Define the following Acts A Townshend Acts B Stamp Act C Declaratory Acts D Proclamation of 1763 E Sugar Act F Writs of Assistance
A container is 18 full of water After 10 cups of water are addedthe container is 34 full What is the volume of the container in cups
Hey Can someone check my answers 1Find the greatest common factor 20y9 5y6 A 5y6 B 5y9 C 10y9 D 20y3 and 2 Find the greatest common factor 12xy5 60x4y2 24x3y3 A