bewellplus.gsu.edu
kadenceclay26
kadenceclay26 kadenceclay26
  • 02-10-2016
  • Mathematics
Answered

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Verified Answer :

charstar
charstar charstar
  • 02-10-2016

54/3=18

hope this helps :)

Answer Link

Related Questions

Andy and Sam are saving money to go on their senior trip The amount of money that Andy will have at the end of each week w can be expressed at Aw 20w 300 The am
Helpp What is the length of stack H D with bar on top when BH 20 in BC 12 in and DC 14 in Round your answer to the nearest tenth of an inch
Infer Why does Mallam Sile build a new tea shop In what way might this be seen as a turning point in the story
Which of the following was a response to the economic effects of Reconstruction in Georgia A triangular trade B mercantilism C sharecropping D slave labor
Which of the following fiscal policy action would cause the economy to contract a raise taxes c decrease the money supply b increase government expenditures d b
Citizens do have choices but if their choices conflict with their duties the government imposes consequences T or F
What happened during Hudsons last voyage
A Democratic president faced with a Republicanmajority Senate is trying to appoint judges to the federal bench Which of the following is the most likely reason
Attacking the person instead of the argument is a type of logical fallacy called A straw man B bandwagon effect C ad hominem D red herring
name a part that does not belong in the animal cell as you figured out during the construction