bewellplus.gsu.edu
alisa9 alisa9
  • 23-09-2016
  • Mathematics
Answered

30men can finish 1/7of a work in 2days.18men will do othe remaining work in ?

Verified Answer :

chumxo chumxo
  • 24-09-2016

7/7-1/7=6/7 is the rest of work
1/7 work takes 2days
61/7=6/7 work takes 62days=12days
30 men takes 12 days to finish the rest of work (6/7)
18 men takes 18*12/30= 7.2days

Answer Link

Related Questions

three important traits of a good summary
how did living conditions for the lord and workers differ
The braceros were Mexican workers who came to the United States during World War II to harvest crops True False
Which represents the empirical formula for a3B9
A supervisor spends a day inspecting a nuclear plant for potential radiation leaks She has to move throughout the plant inspecting all the equipment and machine
Alex has evaluated her skills and determined that she has excellent power She wants to sign up for two sports that will play to her strengths Which two sports w
Your brain is made of what percent water
water is a molecule
how many molecules are there in PbS
How many grams of O2 are required to burn 18 grams of C5H12 C5H12 8O2 5CO2 6H2O