bewellplus.gsu.edu
williamsjasmine williamsjasmine
  • 10-05-2016
  • Mathematics
Answered

If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Verified Answer :

juju3911
juju3911 juju3911
  • 10-05-2016

8 people could stain a deck in one day.

Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016

the answer to this is 8

Answer Link

Related Questions

Design an investigation to compare the durability of the three different brands
A survey found that 3 out of 100 people have red hair On the basis of this survey how many people in a group of 12000 people are likely to have red hair A4000 B
When aqueous solutions of HCl and NaOH are mixed together in a calorimeter the temperature of the solution increases The reaction is endothermic causing an incr
Comment est la classe de maths Elle est
An editor would like to see every sentence containing the word cat that appears in a PowerPoint presentation Which options should the editor use to see every se
In the eleventh century who did the Muslims refer to as the army of God a Turks b Christians c Chinese d Buddhists
Why are most organic compounds nonconducting and insoluble in water Check all that apply Most organic compounds dont dissolve in water because they are polar Mo
why were the liberated countries so unstable
Which of the following is NOT a behavioral difficulty children with facial alcohol syndrome face A Problems with shyness B Problems with impulse control C Probl
An is an agreement among two or more two companies to join forces to pursue specific opportunities without actually merging their operations