a concrete patio is 5 meters long, 3.5 meters wide, and 8 centimeters thick. How many cubic meters of concrete were needed to build the patio?

Verified Answer :

apologiabiology
apologiabiology apologiabiology
  • 09-05-2016

volume=legnth times withd tiem height
since it s only multiply, doesn't matter the order

very tricksy
they gave us the thickness in centimeters, not in meters

8cm=8/100m=0.08m

V=53.50.08
V=0.40*3.5
V=1.40

1.40 cubic meters (conversion is important)

Answer Link

Related Questions

This type of organelle carries digestive enzymes capable of destroying such foreign material as bacteria
What is the name of the intense phase of developments that began in Great Britain during the 1700s a May Fourth Movement b Socratic Method c Industrial Revoluti
Which of the following was a factor in whether or not a dynasty had the Mandate of Heaven A the wealth of a ruling dynasty B the spiritual commitment of a rulin
To deal with the banking crisis FDR and Congress passed the A Federal Emergency Relief Act B Federal Deposit Insurance Corporation C Emergency Banking Bill D Bo
Which explains how wind speeds create waves
In China the ultimate authority to make decisions and guide the country belongs to the A Communist party B courts C president D state council
How did World War I impact minorities in the war and on the homefront
Criminology is the act of being a criminal True or False
Which sentence uses correct punctuation A Rodney asked for a hamburger with pickles Jill requested tofu B Rodney asked for a hamburger with pickles Jill request
Which rights are necessary for entrepreneurs to obtain credit and capital